All Solutions, Inc. (ASI) helps companies execute workplace projects without having to manage disconnected vendors, trades, and field teams on their own.

Follow Us

CCC Information Services Cerritos Office Decommission

Home > Projects > CCC Information Services Cerritos...
CCC Information Services

Case Study | Decommission

CCC Information Services Cerritos Office Decommission

ASI coordinated furniture clearance, power and cable removals, wall preparation and cleaning for CCC Information Services, connecting field crews, disposal logistics and weekend building access.

View Full Case Study PDF

CCC Information Services Cerritos Office Decommission PDF cover

Overview

The Challenge

Workstations, technical systems and wall-mounted items had to be removed from the same second-floor workplace. Weekday-only waste collection and separate weekend building access added dependencies to the field sequence.

ASI’s Approach

ASI linked furniture removal with electrical safeoff, low-voltage and wireless-device removal, e-waste handling, wall patching and cleaning. The work sequence aligned ASI and partner crews with elevator protection, bins and building access.

Project Info

Client
CCC Information Services
Location
Cerritos, California
Delivery
Office and technical decommission
Status
Completed

The Work Area

Clearing the Workplace, Coordinating the Exit

Furniture removal, electrical safing and low-voltage removals shared one second-floor work area. ASI coordinated the crews, loadout and disposal across those scopes.

Cleared office floor with existing room finishes retained | Completed

Cleared office floor with existing room finishes retained | Completed

The ASI Approach

How the Work Was Sequenced

Furniture and technical removalASI coordinated workstation clearance with power safing, cable and wireless-device removal, and e-waste handling.
Building access and disposalWaste-bin delivery, exchange and collection had weekday restrictions and advance-notice requirements. ASI coordinated those services with the field crew schedule and confirmed separate weekend building access.
Wall preparation and cleaningASI removed wall-mounted items, patched the affected surfaces and cleaned the cleared work areas.

Field Execution

Project Gallery

The Result

Work Areas Cleared and Walls Patched

Completion photographs show cleared work areas and patched wall surfaces. Existing room finishes and breakroom cabinetry remained.

All Solutions, Inc.

Planning a Technical Office Exit?

Discuss Your Project

View Full Case Study PDF

Explore ASI Projects

Ready to Move Your Project From Plan to Field?