Case Study | Decommission
CCC Information Services Cerritos Office Decommission
ASI coordinated furniture clearance, power and cable removals, wall preparation and cleaning for CCC Information Services, connecting field crews, disposal logistics and weekend building access.
Overview
The Challenge
Workstations, technical systems and wall-mounted items had to be removed from the same second-floor workplace. Weekday-only waste collection and separate weekend building access added dependencies to the field sequence.
ASI’s Approach
ASI linked furniture removal with electrical safeoff, low-voltage and wireless-device removal, e-waste handling, wall patching and cleaning. The work sequence aligned ASI and partner crews with elevator protection, bins and building access.
Project Info
- Client
- CCC Information Services
- Location
- Cerritos, California
- Delivery
- Office and technical decommission
- Status
- Completed
The Work Area
Clearing the Workplace, Coordinating the Exit
Furniture removal, electrical safing and low-voltage removals shared one second-floor work area. ASI coordinated the crews, loadout and disposal across those scopes.
The ASI Approach
How the Work Was Sequenced
Field Execution
Project Gallery
The Result
Work Areas Cleared and Walls Patched
Completion photographs show cleared work areas and patched wall surfaces. Existing room finishes and breakroom cabinetry remained.