All Solutions, Inc. (ASI) helps companies execute workplace projects without having to manage disconnected vendors, trades, and field teams on their own.

Follow Us

Deckers Brands Goleta Two-Floor Workplace Decommission

Home > Projects > Deckers Brands Goleta Two-Floor...
Deckers Brands

Case Study | Selective Workplace Decommission

Two Floors.
One Coordinated
Decommission.

ASI coordinated furniture dismantling, workstation power disconnection and removal logistics across two levels of the Deckers workplace in Goleta.

View Full Case Study PDF

Cover of the Deckers Goleta two-floor decommission case study

Overview

The Challenge

The exit involved two floors, connected workstations and a mix of furniture to remove or retain. A small elevator, protected finishes and changing room instructions made the removal sequence matter.

ASI’s Approach

Working through OFG, ASI combined dismantling crews, an electrician, building protection and disposal logistics. Tagged items and room exceptions defined what could leave and what had to remain.

Project Info

End user
Deckers Brands
Location
Goleta, California
Site
6601 Hollister Avenue, Building 1
Partner
OFG
Footprint
Two floors
Scope
Selective decommission

Two-Floor Spatial Context

Remove What Is Designated.
Protect What Remains.

The existing furniture layouts show the two-level workplace and its varied office, conference and open-work areas. ASI coordinated the removal list with retained items and room-specific exceptions.

Existing second-level office, conference and open-workplace furniture layout

Level two existing furniture layout

Existing first-level furniture and circulation layout

Level one existing furniture layout

The ASI Approach

Disconnect. Dismantle.
Manage the Way Out.

The workplace exit connected technical disconnection with physical removal. ASI kept the furniture decisions, field labor and route protection within one coordinated assignment.

Separate removal from retentionRoom instructions and tagged furniture distinguished the items to remove from those the workplace team intended to retain.
Disconnect workstation powerAn onsite electrician addressed power connections within the workstations as part of the dismantling assignment.
Dismantle the selected furnitureCrews removed designated cubicles, office furniture and whiteboards across the two-level workplace.
Manage the building routeFloor, wall and elevator protection accompanied movement through the building, including a constrained elevator route.
Coordinate disposal logisticsRemoval labor, trucks and disposal arrangements supported the exit, with metal separated within the defined disposal scope.

The Selected Removal Scope

Selected Areas Cleared.

The completed areas show the furniture-removal result across open work areas and enclosed rooms. Existing flooring, walls, glazing and other retained building features stayed in place.

Cleared open work area at Deckers in Goleta, with retained floor cables and existing building finishes | Completed

Open workplace clearance | Completed

Office area following selected furniture removal, with existing flooring and windows retained | Completed

Cleared office | Completed

The Workplace Before Removal

Furniture Decisions.
A Defined Removal Scope.

Office furniture formed part of the selective removal assignment, with tagged items and room-specific exceptions defining what would remain.

Office furniture in the Deckers Goleta workplace before the selected removal scope | Before

Office furniture | Before

The Building Interfaces

Existing Finishes.
Retained Items and Circulation.

Completed selective-removal areas retain their building finishes and the items or services that remained outside the removal scope.

Cleared room retaining original wall marks, floor finishes and the attached Keep tag | Completed

Furniture removed | Completed

The Result

A Controlled Workplace Exit.

Cleared work areas

The completed photographs show open areas and rooms after the selected furniture was removed.

Protected surroundings

Building protection covered floors, walls and the elevator along the removal route.

Connected responsibilities

Crews, electrical disconnection and disposal logistics were managed within the same assignment.

A defined scope

The exit preserved the distinction between ASI removal work and items or services retained by others.

All Solutions, Inc.

Planning a Workplace Transition?

Coordinate selective removal, electrical disconnection and protected building access through one accountable partner.

Discuss Your Project

View Full Case Study PDF

Explore ASI Projects

Ready to Move Your Project From Plan to Field?