+ Deloitte | Glendale Site Exits

Two Glendale Sites.
Two Different Exits.
One Accountable Team.

ASI connected dismantling, electrical safe-off, workplace removal, warehouse clearance and material recovery across two distinct Glendale properties.

View Full Case Study PDF

2 SitesOffice + warehouse
32,580 lbRecorded metal recovery
Safe-OffPower + furniture

Overview

Challenge

Two separate Glendale locations presented different exit obligations. A twelfth-floor workplace required controlled building access and coordinated furniture and power removal. A warehouse added pallet racking, a rack-built mezzanine, equipment and substantial stored materials.

ASI Approach

Build a site-specific removal sequence, connect electrical isolation to dismantling, and match labor and loadout resources to each property. Separate retained infrastructure and recyclable materials from the disposal stream.

Results

  • Office and warehouse exits delivered through separate site plans
  • Racking, rack-built mezzanine and specified contents removed
  • 32,580 pounds of metal recovery documented through project records

Deloitte | Glendale

At North Brand, ASI connected a twelfth-floor office removal to building access, power disconnection and overflow clearance. At Flower Street, the assignment extended through warehouse contents, pallet racking, a rack-built mezzanine and material recovery.

Project Info

Client
Deloitte
Location
Glendale, California
North Brand
Twelfth-floor office
Flower Street
Offices + warehouse
Delivery
Two distinct site exits
Metal Recovery
32,580 lb recorded

Plans and Project Scale

Different Buildings. Site-Specific Exit Plans.

The North Brand drawing maps the twelfth-floor workplace. Flower Street was a separate office-and-warehouse assignment with different removal boundaries, shown in the field photographs later in this case study.


Twelfth-floor workplace and removal context plan
Twelfth-Floor Workplace and Removal Context
2 SitesOffice + warehouse
32,580 lbRecorded metal recovery
Safe-OffPower + furniture

The Plan Connected the Field Work

North Brand required office furniture, conference-room power and overflow clearance. Flower Street required office and warehouse contents, pallet racking, the rack-built mezzanine and exterior items. The sites were distinct assignments, not one single-floor scope.

The ASI Delivery Model

Two Site-Specific Plans. One Accountable Execution Partner.

ASI matched the labor, access, loadout and dismantling sequence to each property while maintaining a clear boundary between removed items, retained infrastructure, recyclable material and disposal.

01

Plan Each Site Around Its Constraints

At North Brand, coordinate the freight elevator, loading reservations, protection, installers, movers and trucks. At Flower Street, sequence office clearance and warehouse dismantling around retained building infrastructure.

02

Decommission the Office Workplace

Dismantle desks, tables, cubicles and specified contents. Coordinate furniture and conference-room power disconnection before removal, with low-voltage handling defined for each location.

03

Dismantle the Warehouse Storage

Remove pallet racking and the mezzanine constructed from rack components. Remove anchors and grind projecting bolts flush while leaving retained warehouse rooms and building systems in place.

04

Separate Recovery From Disposal

Route recyclable metal separately from remaining contents and disposal. Coordinate dedicated containers, equipment removal and material handling. Project receipts record 32,580 pounds of metal recovery.

05

Complete Site-Specific Clearance

Carry North Brand office and overflow-space cleanout through one removal package. At Flower Street, clear the specified offices, warehouse contents and exterior items, then complete the final sweep.

One Team Controlled Every Dependency

North Brand required elevator and loading coordination. Flower Street required rack dismantling and warehouse material flow. Each location had its own removal boundaries, crews and loadout plan.

Survey Isolate Dismantle Recover Load Out Clear

One accountable partner from planning through final closeout.

The Outcome

Offices Cleared. Storage Dismantled. The Whole Exit Brought Together.

ASI delivered distinct office and warehouse exit packages. Flower Street completion views show cleared offices and warehouse areas after the removal work, while project recovery records document 32,580 pounds of metal shipments.

2 SitesDistinct Exit Environments

A high-rise office and an office-and-warehouse property required different release plans.

32,580 lbRecorded Metal Recovery

Project shipment records document the recovered metal leaving the site.

IntegratedRemoval + Infrastructure

Furniture, power, handling and clearance were coordinated together.

What the Project Delivered

Warehouse Floor Released

Pallet racking, the rack-built mezzanine and specified stored contents were removed at Flower Street.

High-Rise Logistics Coordinated

North Brand combined office removal and overflow cleanout with elevator, loading and truck coordination.

Material Recovery Documented

Separate recycling routes and shipment records made recovery a measurable part of the site exit.

Retained Infrastructure Protected

Each location had a defined boundary between removal items and the building systems and rooms that stayed.

One Accountable Partner. From Electrical Isolation to Final Clearance.

Delivery Result

Two different exit environments were addressed through site-specific work plans, coordinated field crews and documented material recovery.

Planning a Complex Office or Warehouse Exit?

Warehouse Execution

The Flower Street assignment combined warehouse contents, pallet racking and a rack-built mezzanine with office clearance. Retained rooms and building systems stayed in place.

Office Execution

North Brand views show the workplace that entered decommissioning. The Flower Street comparison shows furniture removal while each location’s retained building conditions remained visible.

One Accountable Partner. The Whole Assignment.

ASI connected high-rise access, electrical isolation, workplace decommissioning, warehouse dismantling, material recovery and final clearance through site-specific field plans.

Ready to Move Your Project From Plan to Field?