Decommissioning and Facility Clearance
Oriental Motor Torrance Industrial Facility Clearance
At the Knox Street facility, ASI connected industrial dismantling with workplace clearance. The assignment brought interior removal, technical coordination, exterior work and debris logistics under one accountable partner.
View Full Case Study PDF
Overview
Challenge
The facility exit combined warehouse dismantling, office clearance and exterior sign work. A change in unobstructed access added a scheduling constraint across crews, equipment and debris removal.
ASI approach
ASI coordinated the removal scopes, selective electrical and low-voltage work, local repairs and cleaning. Access equipment and field scheduling were adjusted as the site-access sequence changed.
Results
- Warehouse floor space cleared
- Office contents and exterior signs removed
- Field work and access logistics coordinated
Field execution
Inside the project.
The outcome
What the project delivered
The Torrance assignment demonstrates ASI's ability to coordinate industrial, workplace and exterior removal responsibilities within one facility exit.

Read the full case study.
Download PDF





