Regent Properties: Los Angeles Weekend Office Decommission

Home > Projects > Regent Properties: Los Angeles...
Regent Properties

Case Study | Weekend Office Decommission

One Office Exit.
Connected Field Work.

ASI coordinated furniture dismantling, electrical disconnects, cable removal and street-level loadout for a Los Angeles office exit within a weekend work plan.

View Full Case Study PDF

Cover of the Regent Properties Los Angeles Weekend Office Decommission case study

Overview

The Challenge

The office exit combined furniture dismantling and infrastructure removal with shared elevator access and curbside truck loading. Crews had to sequence the work around the same circulation and loading routes.

ASI’s Approach

ASI connected the furniture crew, electrical disconnects and low-voltage removal to a weekend field plan. Floor protection, reserved curb access and coordination with the moving crew supported the loadout. Furniture dismantling on Saturday was followed by cable removal on Sunday.

Project Info

Client
Regent Properties
Location
Los Angeles, California
Site
11990 San Vicente Boulevard
Work area
Suite 200
Delivery
Weekend office decommission
Status
Completed

The Furniture Layout

The Office Before Removal.

Original furniture and room layout for the single-floor Regent Properties office decommission in Los Angeles

Original furniture layout | Single-floor decommission

Furniture Clearance

The Furniture Footprint Cleared.

Workstation areas and private offices were cleared while the existing room divisions remained. ASI coordinated the furniture, technical removal and loading requirements through one accountable partner.

Cleared workstation area at Regent Properties in Los Angeles | Completed

Workstation area cleared | Completed

The ASI Approach

Furniture. Power. Cable. Loadout.

Prepare the access routeCoordinate shared elevator use, curbside loading reservations and floor protection for the office loadout.
Address workstation powerInclude electrical disconnects in the removal scope so furniture and connected infrastructure could be addressed together.
Clear the furniture footprintDismantle workstations and remove tables, private-office furniture, filing cabinets and surplus items.
Remove low-voltage cablingPull low-voltage runs back to the server room, coordinating ceiling access with the cleared furniture footprint.
Finish the removal sequenceRemove remaining items and broom-sweep the suite after the main loadout and cable work.

Field Execution

The Removal Phases in View.

Completed Furniture Clearance

The Cleared Office Areas.

The Result

The Exit Scopes Connected.

Workstation areas and private offices were cleared while the existing room divisions remained. ASI coordinated the furniture, technical removal and loading requirements through one accountable partner.

All Solutions, Inc.

Planning a workplace exit with connected scopes?

Connect the furniture removal, technical scope and loading requirements through one accountable project partner.

Discuss Your Project

View Full Case Study PDF

Explore ASI Projects

Ready to Move Your Project From Plan to Field?