All Solutions, Inc. (ASI) helps companies execute workplace projects without having to manage disconnected vendors, trades, and field teams on their own.

Follow Us

Stantec Ann Arbor Workplace Exit

Home > Projects > Stantec Ann Arbor Workplace...
Stantec Ann Arbor Workplace Exit case study cover

CASE STUDY | WORKPLACE CLEARANCE AND CLOSEOUT

Office Clearance, Wall Preparation and Debranding

ASI brought furniture clearance, electrical disconnection, wall preparation and debranding together at Stantec's Ann Arbor workplace.

View Full Case Study PDF
Stantec Ann Arbor Workplace Exit case study cover
CLEARFURNITURE AND CONTENTS
PREPARELOCALIZED WALL AREAS
CLOSEOUTINTERDEPENDENT FIELD SCOPES

Overview

Challenge

An office exit required more than removing desks. Electrical infeeds, mounted items, reception furniture, IT-room contents and corporate signage each needed a defined treatment as the workplace was cleared.

ASI approach

Working with Atlantic Relocation, ASI coordinated contents removal and disposal, electrical disconnection, localized wall preparation and separate sign debranding. Reception changes were incorporated into the origin-office scope.

Results

  • Office areas cleared of designated furniture and contents
  • Affected wall areas patched and prepared
  • Interior branding removed and monument sign debranded

Early origin-workplace layout

READ THE WORKPLACE. ORGANIZE THE CLEARANCE.

The early occupied-origin layout shows the relationship between open work areas, enclosed rooms and circulation. It provides spatial context for contents removal, electrical interfaces and the localized wall work across the suite.

Early occupied-origin layout

Early occupied-origin layout

Coordinated field delivery

Scope of work

  • Designated office furniture and contents removal
  • Electrical infeed disconnection and capping
  • Localized mounted-item wall preparation
  • Reception furniture teardown and selective IT-room cleanup
  • Interior branding removal and exterior sign debranding

The outcome

OFFICE AREAS CLEARED. A COORDINATED ORIGIN EXIT.

Designated office furniture and contents were removed from the Ranchero Drive suite. Electrical interfaces, mounted-item wall preparation and debranding were coordinated alongside the clearance.

Contents and reception addressed

The origin scope included workstation and office removal, additional contents and a reception change order.

Electrical interfaces coordinated

Workstation infeeds were disconnected and capped as part of the decommission assignment.

IT-room cleanup included

Selective cleanup and UPS removal formed part of the origin closeout work.

Wall preparation followed removal

Localized patches addressed the surfaces exposed by boards, cleats and other mounted items.

Field execution

THE CONTENTS REMOVED. THE CLOSEOUT DETAILS ADDRESSED.

The cleared office retains its existing floors, ceilings and room structure. Separate views show localized wall patches and the blank exterior sign face, with the monument structure remaining in place.

Stantec Ann Arbor Workplace Exit case study cover

Read the full case study.

Download PDF

One accountable partner.

PLANNING A WORKPLACE EXIT OR DECOMMISSION?

ASI connected furniture removal, electrical disconnection, localized wall preparation and debranding in one managed origin-office exit for Atlantic Relocation at Stantec's Ann Arbor workplace.

Start a Project

Ready to Move Your Project From Plan to Field?