
CASE STUDY | WORKPLACE RECONFIGURATION
TEARDOWN TO REBUILD. COORDINATE THE POWER. ONE ACCOUNTABLE TEAM.
ASI performed workstation teardown and rebuild at Stantec's Bakersfield workplace, pairing the furniture reconfiguration with electrical disconnect and reconnect scope.
Overview
The Bakersfield assignment combined workstation reconfiguration with its electrical dependencies. ASI dismantled and rebuilt workstations while coordinating the disconnect and reconnect scope within the existing workplace.
Challenge
Changing interconnected workstations required coordination between furniture dismantling, component staging and rebuild. Electrical disconnect and reconnect were part of the same reconfiguration scope.
ASI approach
ASI connected the workstation layout, teardown, handling and rebuild with the cubicle electrical interfaces. The work was organized around those linked responsibilities within the existing office.
Results
- Workstation teardown and rebuild
- Electrical interfaces in the same scope
- Connected furniture and field coordination
Workstation layout and field transition
REBUILD WITH A LAYOUT. CONNECT THE FIELD TRANSITION.
The receiving-layout workstation zone connects retained and relocated furniture positions. Worktops, supports and related components were staged through the rebuild transition, linking the layout with assembly and cubicle power interfaces.

Receiving layout | workstation zone
The ASI delivery model
ALIGN THE FIELD PACKAGES. MANAGE THE REBUILD INTERFACES.
Workstation geometry, component handling and power connections affected the same reconfiguration. ASI connected those responsibilities through the defined teardown and rebuild scope.
Align the workstation scope
Connect the furniture arrangement and rebuild requirements with the affected cubicle power interfaces.
Coordinate disconnection
Include electrical disconnect with the workstations being dismantled as part of the reconfiguration scope.
Dismantle and handle components
Take apart the workstations and stage worktops, supports and related components for the rebuild transition.
Reassemble the workstations
Perform the workstation rebuild within the existing office, with furniture assembly and electrical interfaces coordinated.
Address the reconnect scope
Keep cubicle electrical reconnect connected to the rebuild package and its field responsibilities.
The outcome
WORKSTATIONS REBUILT. RESPONSIBILITIES CONNECTED.
ASI performed the workstation teardown and rebuild, with electrical disconnect and reconnect included in the reconfiguration scope. The assignment connected physical furniture work with its power interfaces.
Workstation rebuild
The assignment moved from workstation dismantling to rebuild within the Bakersfield office.
Electrical interfaces
Cubicle electrical disconnect and reconnect were part of the defined reconfiguration scope.
Component handling
Dismantled worktops and supports were staged as part of the rebuild transition.
One coordinated assignment
ASI connected furniture work and power interfaces through the same field scope.
Field execution
THE EXISTING WORKPLACE. THE TEARDOWN TRANSITION.
The reconfiguration involved assembled workstation rows, retained office elements and a staging area for dismantled components. Electrical interfaces were part of the same scope.

Read the full case study.
ASI performed the workstation teardown and rebuild while coordinating its electrical disconnect and reconnect scope. The work connected furniture reconfiguration, component handling and power interfaces within the existing office.

One accountable partner.
PLANNING A WORKPLACE RECONFIGURATION?
ASI paired workstation teardown and rebuild with the electrical disconnect and reconnect scope. Component handling and furniture assembly were coordinated with the power interfaces within one reconfiguration assignment.


