All Solutions, Inc. (ASI) helps companies execute workplace projects without having to manage disconnected vendors, trades, and field teams on their own.

Follow Us

Stantec Bakersfield Workplace Reconfiguration

Home > Projects > Stantec Bakersfield Workplace Reconfiguration
Bakersfield office privacy glazing, Completed

CASE STUDY | WORKPLACE RECONFIGURATION

TEARDOWN TO REBUILD. COORDINATE THE POWER. ONE ACCOUNTABLE TEAM.

ASI performed workstation teardown and rebuild at Stantec's Bakersfield workplace, pairing the furniture reconfiguration with electrical disconnect and reconnect scope.

View Full Case Study PDF

Stantec Bakersfield workplace reconfiguration, office privacy glazing Completed

REBUILDWORKSTATION LAYOUT
POWERCUBICLE INTERFACES
ONE TEAMFIELD COORDINATION

Overview

The Bakersfield assignment combined workstation reconfiguration with its electrical dependencies. ASI dismantled and rebuilt workstations while coordinating the disconnect and reconnect scope within the existing workplace.

Challenge

Changing interconnected workstations required coordination between furniture dismantling, component staging and rebuild. Electrical disconnect and reconnect were part of the same reconfiguration scope.

ASI approach

ASI connected the workstation layout, teardown, handling and rebuild with the cubicle electrical interfaces. The work was organized around those linked responsibilities within the existing office.

Results

  • Workstation teardown and rebuild
  • Electrical interfaces in the same scope
  • Connected furniture and field coordination

Workstation layout and field transition

REBUILD WITH A LAYOUT. CONNECT THE FIELD TRANSITION.

The receiving-layout workstation zone connects retained and relocated furniture positions. Worktops, supports and related components were staged through the rebuild transition, linking the layout with assembly and cubicle power interfaces.

Bakersfield receiving workstation layout

Receiving layout | workstation zone

LAYOUTRETAINED AND RELOCATED
POWERCUBICLE INTERFACES
REBUILDCONNECTED FIELD SCOPE

The ASI delivery model

ALIGN THE FIELD PACKAGES. MANAGE THE REBUILD INTERFACES.

Workstation geometry, component handling and power connections affected the same reconfiguration. ASI connected those responsibilities through the defined teardown and rebuild scope.

LAYOUT

Align the workstation scope

Connect the furniture arrangement and rebuild requirements with the affected cubicle power interfaces.

POWER

Coordinate disconnection

Include electrical disconnect with the workstations being dismantled as part of the reconfiguration scope.

STAGE

Dismantle and handle components

Take apart the workstations and stage worktops, supports and related components for the rebuild transition.

REBUILD

Reassemble the workstations

Perform the workstation rebuild within the existing office, with furniture assembly and electrical interfaces coordinated.

CONNECT

Address the reconnect scope

Keep cubicle electrical reconnect connected to the rebuild package and its field responsibilities.

The outcome

WORKSTATIONS REBUILT. RESPONSIBILITIES CONNECTED.

ASI performed the workstation teardown and rebuild, with electrical disconnect and reconnect included in the reconfiguration scope. The assignment connected physical furniture work with its power interfaces.

Workstation rebuild

The assignment moved from workstation dismantling to rebuild within the Bakersfield office.

Electrical interfaces

Cubicle electrical disconnect and reconnect were part of the defined reconfiguration scope.

Component handling

Dismantled worktops and supports were staged as part of the rebuild transition.

One coordinated assignment

ASI connected furniture work and power interfaces through the same field scope.

Field execution

THE EXISTING WORKPLACE. THE TEARDOWN TRANSITION.

The reconfiguration involved assembled workstation rows, retained office elements and a staging area for dismantled components. Electrical interfaces were part of the same scope.

Stantec Bakersfield workplace reconfiguration, office privacy glazing Completed

Read the full case study.

ASI performed the workstation teardown and rebuild while coordinating its electrical disconnect and reconnect scope. The work connected furniture reconfiguration, component handling and power interfaces within the existing office.

Download PDF

Explore Stantec’s national workplace program

One accountable partner.

PLANNING A WORKPLACE RECONFIGURATION?

ASI paired workstation teardown and rebuild with the electrical disconnect and reconnect scope. Component handling and furniture assembly were coordinated with the power interfaces within one reconfiguration assignment.

Start a Project

Ready to Move Your Project From Plan to Field?