Stantec Bellevue 33rd Place: Technical Workplace Decommission

Home > Projects > Stantec Bellevue 33rd Place:...
Stantec Bellevue 33rd Place: Technical Workplace Decommission case study cover

CASE STUDY | TECHNICAL OFFICE DECOMMISSION

Disconnect. Dismantle. Clear the way.

ASI connected office clearance, electrical and data removal, HVAC dismantling and surface preparation while adapting field logistics to changing site conditions.

View Full Case Study PDF
Stantec Bellevue 33rd Place: Technical Workplace Decommission case study cover
CLEARWORKPLACE CONTENTS
REMOVETECHNICAL INFRASTRUCTURE
ADAPTCREWS AND TRANSPORT

Overview

Challenge

Stantec's 33rd Place office exit combined furniture and content removal with technical work above the ceiling, on the roof and within the office infrastructure. Electrical disconnections, network cabling, HVAC equipment and backup power required coordination alongside the physical clearance. An elevator outage and uncertain bin service complicated material movement, while concealed equipment added work in the field.

ASI approach

ASI connected the removal trades, field labor and transport resources in one decommission plan. Occupied-building access, bin placement and material movement were coordinated with the technical work. When conditions changed, the assignment incorporated additional trucks, drivers and labor, along with a newly identified ceiling HVAC blower and associated ceiling-grid work.

Results

  • Office contents cleared from the suite
  • Technical removal scopes coordinated
  • Transport and labor adapted to field constraints

Early workplace layout and scope relationships

UNDERSTAND THE SPACE. CONNECT THE REMOVALS.

The early workplace plan shows the relationship between open work areas, enclosed rooms and circulation. It helps explain why furniture clearance, technical disconnections and material movement had to be coordinated across the suite.

Early workplace layout showing open office areas, enclosed rooms and circulation at Stantec's Bellevue 33rd Place office.

Early workplace plan | Spatial context

The ASI delivery model

TECHNICAL DEPENDENCIES. ONE CONNECTED FIELD PLAN.

ASI treated the exit as an integrated decommission. Technical removals, workplace clearance and surface preparation were coordinated with occupied-building access and changing hauling conditions.

CLEAR

Dismantle and remove contents

Clear cubicles, furniture, residual contents and interior signage, with broom-sweep and trash removal within the suite.

POWER

Disconnect power and data

Coordinate electrical disconnection, low-voltage cable removal and technical-room cleanout alongside workplace dismantling.

SYSTEMS

Address equipment dependencies

Carry rooftop AC removal, an added concealed ceiling blower and backup-power removal into the technical scope.

PREP

Prepare localized wall areas

Patch, prepare and prime wall areas affected by removed boards, displays and interior signage.

ADAPT

Adjust hauling and field labor

Add trucking, drivers and labor in response to uncertain bin service and an elevator outage, while managing newly identified work.

The outcome

MORE THAN FURNITURE REMOVAL. A TECHNICAL WORKPLACE EXIT.

The workplace was cleared of furniture and designated contents, with electrical, cabling and equipment-removal responsibilities coordinated through the same assignment. Localized wall preparation and practical changes to transport and labor supported the office exit. The project shows ASI's ability to connect the visible clearance with the technical dependencies and field adjustments behind it.

One accountable field plan

The assignment connected office clearance, technical removals and material handling across the workplace.

Hidden scope addressed

The newly identified ceiling blower was added to the removal scope with associated ceiling-grid work.

Practical access response

The removal plan incorporated added labor and transport as elevator and bin availability changed.

Localized surfaces prepared

Patching, preparation and primer addressed wall areas exposed by the removal of boards, displays and signage.

Field execution

WORKPLACE CLEARANCE. TECHNICAL WORK BEHIND IT.

Furnished and cleared office views show the workplace before and after content removal. Supporting views capture HVAC handling, backup-power dismantling and the movement of materials through the building.

Stantec Bellevue 33rd Place: Technical Workplace Decommission case study cover

Read the full case study.

Download PDF

One accountable partner.