Case study | Multi-trade lease exit

Clear the workplace. Align the trades. One accountable lead.

ASI coordinated furniture decommissioning, tenant-system requirements and a separate building-restoration scope for Stantec’s high-rise office exit in Chicago.

View Full Case Study PDF

Cleared Stantec Chicago office with retained partitions and glazing
Cleared workplace | Completed
CLEARassigned contents
ALIGNtrade requirements
CONNECTfield teams

Overview

The departing workplace contained private offices, dense workstation clusters, filing and shared spaces. Removal activities had to connect with tenant electrical and low-voltage requirements, appliances and building-services interfaces while protecting retained partitions, glazing and finishes.

ASI approach

ASI coordinated decommissioning and a separate building-restoration scope as connected work. The sequence aligned field crews, specialist subcontractors, work areas and building requirements. Furniture and contents removal connected with tenant-system disconnections, cabling and access-system requirements, targeted wall work and restoration coordination.

Visible result

Former workstation areas and private offices were cleared while permanent partitions, glazing and retained finishes remained in place. The cleared workplace was the visible outcome; the separate restoration requirements were coordinated, not represented here as certified concealed-system completion.

Plans and workplace context

The existing footprint guided the exit.

These sanitized excerpts show the existing office arrangement and workstation clusters. They document planning context, not an as-built closeout drawing.

The ASI delivery model

Removal was one part of the job.

PLAN

Coordinate the exit sequence

Align field crews, subcontractor work areas, building access requirements and the order of removal and restoration activities.

CLEAR

Decommission workplace contents

Dismantle assigned workstations and furniture, remove designated contents and wall-mounted items, and clear affected work areas.

SYSTEMS

Connect tenant-system requirements

Coordinate electrical disconnections, low-voltage cabling and assigned conduit and access-system removal with the other trades.

RESTORE

Address building-services interfaces

Bring affected plumbing, mechanical, penetration and ceiling requirements into the coordinated restoration plan.

FINISH

Repair and prepare the suite

Coordinate affected-surface repair and cleaning in the work areas. The images below document the visible cleared workplace, not acceptance of concealed systems.

The outcome

A cleared office footprint.

ASI linked the office clear-out to tenant-system and restoration requirements through one accountable project lead. The visible work areas were cleared with retained permanent finishes in place.

Authentic project photographs

Before and completed conditions.

The furniture-and-filing view is explicitly before removal. The other images show the cleared workplace; they do not certify hidden building systems.

Stantec Chicago multi-trade lease exit case study cover

Read the full case study.

See how ASI connected workplace decommissioning with the separate trade requirements behind a high-rise office exit.

View Full Case Study PDF

One accountable partner.

ASI connects the people, trades and field details behind workplace transitions.

Start a Project

Ready to Move Your Project From Plan to Field?