Stantec Irvine: Layered Workplace Construction

Home > Projects > Stantec Irvine: Layered Workplace...
Protected entry route | In Progress

CASE STUDY | TWO-FLOOR WORKPLACE INFILL

Stantec Irvine: Layered Workplace Construction

ASI coordinated a layered workplace construction program across two floors in Irvine. Selective demolition, framing and drywall, glass and door interfaces, flooring, paint and electrical coordination came together through interdependent work packages.

View Full Case Study PDF

Stantec Irvine: Layered Workplace Construction case study cover

Overview

ASI coordinated a layered workplace construction program across two floors in Irvine. Selective demolition, framing and drywall, glass and door interfaces, flooring, paint and electrical coordination came together through interdependent work packages.

Challenge

The work connected infill and finish changes with existing workplace, entry and stair interfaces. Construction separation, surface protection and trade coordination were integral to the delivery.

ASI approach

ASI coordinated base construction and field changes, connecting new wall and door work with electrical interfaces and affected finishes. Temporary separation and protected routes supported staged execution.

Results

  • Two-floor infill and construction scopes coordinated.
  • Wall, door and finish interfaces brought together.
  • Reception occupancy controls functionally tested.

The outcome

One accountable partner.

One accountable partner connected construction, electrical interfaces and finish coordination across a layered workplace project.

Infill and adaptation

Selective demolition, framing, drywall and ceiling interfaces connected the first- and second-floor work packages.

Glazing and finishes

Glass and door interfaces, hardware, carpet and base, painting and reception-floor restoration required coordinated trade sequencing.

Electrical interfaces

Power and data changes were coordinated with affected-wall repair. Site-specific installation and acceptance records cover reception lighting controls.

Field execution

Construction stages

Construction at workplace and stair interfaces required temporary separation and surface protection. Active wall finishing at the glazed room shows the connection between built elements and finish trades. Corridor protection supported staged work, while the installed louver and finished wall detail illustrate a later, bounded finish stage.

Stantec Irvine: Layered Workplace Construction case study cover

Read the full case study.

One accountable partner connected construction, electrical interfaces and finish coordination across a layered workplace project.

Download PDF

One accountable partner.

Planning a workplace project?

One accountable partner connected construction, electrical interfaces and finish coordination across a layered workplace project.