
Case study | Phased workplace transition
Reuse The Assets. Connect The Phases. Move The Workplace.
ASI connected furniture reuse, storage, installation and office closeout for Stantec's workplace transition in Mechanicsburg, Pennsylvania.
View Full Case Study PDF
Overview
Challenge
The assignment brought together furniture from other Stantec offices, assets retained locally and an occupied office preparing to exit. Reuse decisions continued to change as the receiving workplace took shape. Storage, furniture installation and the later local move needed to work as connected phases.
ASI approach
ASI coordinated receiving and storage, furniture delivery and reassembly, the move from Ritter Road to Manor Drive, and the departing office's decommissioning. Field instructions linked the work with client access, furniture power interfaces, IT equipment removal and revised retention and disposal decisions.
Workplace context
Prepare the receiving office. clear the departing space.
The assignment linked two different outcomes: reusable furniture installed in the receiving workplace and selected areas cleared at the departing office. Field work followed the client's evolving retention, relocation and disposal decisions.

Reused open-workplace furniture | Completed
The ASI delivery model
Connected field responsibilities.
Furniture was redeployed into open work areas and private offices. The later office-exit scope brought together disposal, broom sweeping and defined cable removal. The client signed the field record for the second relocation and decommissioning phase.
The outcome
One accountable partner through the transition
ASI kept asset reuse, field installation and office-exit responsibilities connected while the client managed its separate fit-out and technology transition.
Field execution
Project photographs.

Read the full case study.
Download PDF

