Stantec Redlands Office Clearance and Wall Restoration

Home > Projects > Stantec Redlands Office Clearance...
Stantec

Case Study | Office Clearance and Selected Restoration

Clear the Space.
Connect the Removal and Repair.

ASI connected office furniture removal, electrical disconnects and selected wall repairs for Stantec's Redlands workplace exit.

View Full Case Study PDF

Cover of the Stantec Redlands Office Clearance and Wall Restoration case study

Overview

The Challenge

Clearing the workplace meant more than taking out furniture. The assignment also included power disconnects and repairs where wall-mounted items had been removed, while the existing rooms and built-in features remained.

ASI’s Approach

ASI coordinated dismantling and loadout with an electrician and field wall repairs. The team removed the office contents and addressed the selected repair areas as part of the same assignment.

Project Info

Client
Stantec
Location
Redlands, California
Site
25864 Business Center Drive, Suite F
Work
Office clearance
Trades
Removal, electrical disconnects and selected wall repair
Finish
Selected patch, preparation and primer work

The Cleared Furniture Footprint

Contents Removed.
Existing Rooms Retained.

The cleared workplace retained its room divisions, built-in features and existing finishes. Selected wall patches remain visible within the bounded repair scope.

Cleared furniture footprint within Stantec Redlands, retaining existing room divisions, built-in features and visible selected wall patches | Completed

Workplace furniture clearance | Completed

Field Execution

Interior Dismantling.
Exterior Loadout.

Furniture, loose contents and server equipment were included in the office-clearance scope. Crews brought the removal work from the interior rooms to the exterior loading area.

Removal crew with truck, carts, handling equipment and required packaging at the Stantec Redlands loadout | In Progress

Crew loadout | In Progress

The ASI Approach

Removal and Repair.
One Connected Field Assignment.

ASI brought together the people, equipment and trade work needed to clear the office and address the selected wall-repair scope.

Define the removal scopeIdentify office furniture, server equipment and remaining contents included in the workplace clearance.
Include electrical disconnectsCoordinate the electrician's disconnect work with the furniture dismantling and removal scope.
Dismantle and load outRemove cubicles, office furniture and loose contents, using the field crew and handling equipment.
Address wall-mounted removalsPatch, prepare and prime selected surfaces where mounted items had been removed.
Clear the furniture footprintBring the office contents out while retaining the existing rooms and built-in features.

Selected Wall Work and Office Clearance

The Work Behind the Clearance.
The Rooms After Removal.

The crew photograph shows selected wall work in progress. The separate office view records its furniture footprint cleared, with the existing wall finish, carpet and glazing retained.

The Selected Completed Scope

Clearance and Local Repairs.
Existing Finishes Remain.

Selected surfaces were patched, prepared and primed where mounted items had been removed. These views preserve the visible local patches and retained room conditions.

All Solutions, Inc.

Planning a Workplace Exit With Connected Scopes?

ASI coordinated furniture clearance, power disconnects and selected wall repairs so the client could manage those interdependent scopes through one partner.