Case Study | Office Clearance and Selected Restoration
Clear the Space.
Connect the Removal and Repair.
ASI connected office furniture removal, electrical disconnects and selected wall repairs for Stantec's Redlands workplace exit.
Overview
The Challenge
Clearing the workplace meant more than taking out furniture. The assignment also included power disconnects and repairs where wall-mounted items had been removed, while the existing rooms and built-in features remained.
ASI’s Approach
ASI coordinated dismantling and loadout with an electrician and field wall repairs. The team removed the office contents and addressed the selected repair areas as part of the same assignment.
Project Info
- Client
- Stantec
- Location
- Redlands, California
- Site
- 25864 Business Center Drive, Suite F
- Work
- Office clearance
- Trades
- Removal, electrical disconnects and selected wall repair
- Finish
- Selected patch, preparation and primer work
The Cleared Furniture Footprint
Contents Removed.
Existing Rooms Retained.
The cleared workplace retained its room divisions, built-in features and existing finishes. Selected wall patches remain visible within the bounded repair scope.

Workplace furniture clearance | Completed
Field Execution
Interior Dismantling.
Exterior Loadout.
Furniture, loose contents and server equipment were included in the office-clearance scope. Crews brought the removal work from the interior rooms to the exterior loading area.

Crew loadout | In Progress
The ASI Approach
Removal and Repair.
One Connected Field Assignment.
ASI brought together the people, equipment and trade work needed to clear the office and address the selected wall-repair scope.
Selected Wall Work and Office Clearance
The Work Behind the Clearance.
The Rooms After Removal.
The crew photograph shows selected wall work in progress. The separate office view records its furniture footprint cleared, with the existing wall finish, carpet and glazing retained.
The Selected Completed Scope
Clearance and Local Repairs.
Existing Finishes Remain.
Selected surfaces were patched, prepared and primed where mounted items had been removed. These views preserve the visible local patches and retained room conditions.

Planning a Workplace Exit With Connected Scopes?
ASI coordinated furniture clearance, power disconnects and selected wall repairs so the client could manage those interdependent scopes through one partner.