All Solutions, Inc. (ASI) helps companies execute workplace projects without having to manage disconnected vendors, trades, and field teams on their own.

Follow Us

Stantec San Jose: Technical Workplace Clearance

Home > Projects > Stantec San Jose: Technical...

Decommissioning

Clear the office. Remove equipment. Connect the work.

At the East Santa Clara Street office, ASI linked workplace clearance with technical decommissioning. The work addressed the contents and tenant equipment while retaining the surrounding building interior.

View Full Case Study PDF
Stantec San Jose: Technical Workplace Clearance case study cover

Overview

Challenge

The workplace exit combined furniture and contents removal with electrical, low-voltage and cooling tasks. Those responsibilities had to be coordinated within an existing office building.

ASI approach

ASI connected selective disconnections, contents clearance, equipment removal and localized wall preparation in one field assignment, coordinating building access and the different trade interfaces. Electrical and low-voltage tasks supported the removal work. Building access, freight movement and specialist responsibilities were coordinated around the existing office environment.

Results

  • Office furniture and loose contents were removed from the retained interior.
  • Selective electrical and low-voltage work supported equipment and furniture removal.
  • The assignment included targeted wall preparation associated with removed interior items.
  • ASI connected building access and the different field responsibilities within the office exit.

Coordinated field delivery

Clearance across the office

The office-clearance scope extended through work areas and supporting rooms. Selective disconnections and equipment removal formed part of the same exit assignment.

The cleared work areas retained their glazing, ceiling elements, cabinetry and floor finishes. The result is a workplace-clearance story, with local preparation and technical removal.

From installed equipment to a cleared workplace

The field record connects the installed cooling equipment with its removal and the cleared office areas. Retained building elements remain visible throughout.

Field execution

Inside the project.

The outcome

What the project delivered

ASI coordinated the office contents clearance and technical removal responsibilities at Stantec's San Jose workplace, connecting the field scopes within one assignment.

Stantec San Jose: Technical Workplace Clearance case study cover

Read the full case study.

Download PDF

One accountable partner.

Planning a technical workplace exit?

Start a Project

Ready to Move Your Project From Plan to Field?