All Solutions, Inc. (ASI) helps companies execute workplace projects without having to manage disconnected vendors, trades, and field teams on their own.

Follow Us

Stantec St. George

Home > Projects > Stantec St. George
Completed Stantec St. George kitchenette with integrated sink, counter, cabinets and resilient floor

Case study | Workplace kitchenette renovation

A focused renovation, fully coordinated.

ASI brought cabinetry, counters, plumbing, electrical and flooring together to turn a basic Stantec kitchenette into an integrated workplace amenity.

View Full Case Study PDF

Completed Stantec St. George kitchenette with integrated sink, counter, cabinets and resilient floor
Integrated kitchenette | Completed
PLANthe room and casework
CONNECTplumbing and power
FINISHthe workplace amenity

Overview

The existing kitchenette paired a small stand-alone sink with carpeted flooring. The replacement needed to connect new casework and counters with plumbing, power and a usable knee recess.

ASI approach

ASI managed room preparation, floor replacement, cabinet fabrication and installation, plumbing and electrical work as one renovation. The team incorporated changes to the supply and drain arrangement, associated drywall repair and the refrigerator outlet, coordinated with the casework and floor finishes.

Result

The completed kitchenette brings the sink, counter, cabinet storage and resilient flooring into one arrangement. Stantec received one accountable partner across the focused multi-trade renovation.

Design intent

Room plan and casework detail guided the work.

The safe room plan and casework elevation show how sink placement, storage, the counter layout and the sloped under-sink panel were intended to fit together. These drawings illustrate design intent, not a compliance certificate.

The ASI delivery model

Every trade met at the same room.

PREPARE

Reset the space

Prepare the former kitchenette and replace the carpeted floor with a resilient finish.

BUILD

Fabricate and install casework

Coordinate cabinets, counters, storage and the sloped under-sink panel with the room arrangement.

CONNECT

Bring services into place

Coordinate supply, drain and electrical work, including the refrigerator outlet, with the casework.

FINISH

Deliver the integrated amenity

Complete the sink, counter, cabinet and flooring arrangement with related repairs.

The outcome

A single coordinated kitchenette.

ASI turned the basic room into a finished amenity with casework, sink, counter, storage and resilient flooring integrated across multiple trades.

Authentic project photographs

Before, in progress and completed.

The images retain their actual project phases. Exposed plumbing is identified as in progress, not as a finished condition.

Stantec St. George kitchenette renovation case study cover

Read the full case study.

See how ASI connected design intent, casework, plumbing, electrical and finishes in one room.

View Full Case Study PDF

One accountable partner.

ASI coordinates the people and trades behind workplace projects, from initial plan through field completion.

Start a Project

Ready to Move Your Project From Plan to Field?