All Solutions, Inc. (ASI) helps companies execute workplace projects without having to manage disconnected vendors, trades, and field teams on their own.

Follow Us

Stantec Wasilla Office Closeout

Home > Projects > Stantec Wasilla Office Closeout
Stantec Wasilla Office Closeout case-study cover

CASE STUDY | COORDINATED OFFICE CLOSEOUT

CLEAR THE OFFICE. CONNECT THE SCOPES. CLOSE THE LOOP.

ASI coordinated furniture removal, wall patching, disposal and exterior-sign removal for Stantec's Wasilla office exit, connecting field crews and local services around the client's move.

View Full Case Study PDF

Stantec Wasilla Office Closeout case study cover

CLEARWORKPLACE REMOVAL
PATCHWALL REPAIRS
CLOSESITE CLOSEOUT

Overview

One coordinated closeout connected furniture, electrical disconnection, wall repairs, material removal and signage. ASI managed the defined exit scope while preserving the building's retained finishes, fixtures and infrastructure.

Challenge

An office exit in Alaska required more than hauling furniture. Selected cubicle components needed to be preserved for reuse, the client's movers had to finish first, and removal, patching, disposal and signage work needed coordinated field support.

ASI approach

ASI defined retained and removed items, sequenced work behind the move, and brought together its field leads, local labor, disposal services and sign contractor. The work covered open office areas, enclosed rooms and the exterior tenant sign.

Results

  • Furniture and unwanted contents cleared from the office
  • Wall-mounted items removed and affected surfaces patched
  • Exterior tenant-sign panel replaced with a blank panel

Plans and project scale

DEFINE WHAT LEAVES. PROTECT WHAT STAYS.

The project drawings distinguished selected cubicle components for reuse from the office being cleared. ASI's teardown and rebuild responsibilities were coordinated with the client's separate moving provider.

The ASI delivery model

SEPARATE RESPONSIBILITIES. ONE COORDINATED FIELD PLAN.

The move and the decommission were connected but distinct. ASI organized its work around that handoff and the different requirements for reusable furniture, disposal and retained building elements.

PLAN

Coordinate the move interface

Stage the field work and identify reuse components. Begin removal after the client's moving activity, with transport handled by its separate provider.

CLEAR

Dismantle and remove

Disconnect furniture power, take down cubicles and remove unwanted office furniture and contents. Keep the defined retained infrastructure in place.

PATCH

Address the attachment points

Remove wall-mounted signage, boards and overheads, then patch the affected wall surfaces. This was defined repair work, not a full repaint.

HAUL

Connect local disposal services

Coordinate roll-off service and removal logistics with the field crew. Separate selected reuse components from the material leaving the office.

SIGN

Close out the tenant identity

Coordinate exterior-sign work with a local specialist. Replace the tenant panel with a blank panel while retaining the monument structure.

The outcome

THE OFFICE WAS CLEARED. THE CLOSEOUT EXTENDED BEYOND IT.

ASI connected interior removal and wall repairs with disposal and exterior-sign work. The result was a cleared workplace with retained fixtures and building elements left in place, supported by a coordinated field closeout.

Whole-space removal

The work connected open office areas, enclosed rooms, support spaces and the paths used to remove material.

Defined retention

Existing flooring, built-in cabinetry and specified infrastructure remained, with no claim of a full interior renovation.

Furniture reuse interface

Selected cubicle components were designated for teardown and rebuild, with the physical move assigned to another provider.

Exterior coordination

A specialist handled the tenant-sign panel while ASI coordinated that work with the broader office exit.

Field execution

A CLEARED WORKPLACE. A COORDINATED CLOSEOUT.

The completed removal and patching scope is visible across the office. Retained counters, cabinetry, flooring and infrastructure remain part of the existing building, not new ASI construction.

Stantec Wasilla Office Closeout case study cover

Read the full case study.

ASI gave the workplace team one accountable partner for a defined multi-scope exit: coordinate field resources, clear the office, address wall attachment points and bring the exterior sign into the closeout program.

Download PDF

Explore Stantec’s national workplace program

One accountable partner.

PLANNING A MULTI-SCOPE OFFICE EXIT?

Field leads, local labor, disposal services and the sign contractor worked within one coordinated ASI scope. Clear boundaries separated removals, reusable components and the building elements that were to remain.

Start a Project

Ready to Move Your Project From Plan to Field?