CASE STUDY | WORKPLACE CONSTRUCTION
BUILD THE CONNECTIONS. INTEGRATE THE FINISHES. ONE ACCOUNTABLE TEAM.
ASI coordinated mechanical installation, electrical interfaces, interior enclosures and construction-support moves at Thomson Reuters' Alameda workplace.
Overview
The Alameda assignment connected building-system installation with the surrounding workplace. ASI coordinated the field interfaces, construction protection, finish enclosure and supporting movement of workplace contents.
Challenge
Adding mechanical equipment within an existing workplace meant connecting garage installation, routed services and interior finish work. Workstations and equipment also needed protection and coordinated movement around construction.
ASI approach
ASI brought the mechanical, electrical, coring, enclosure and move packages into one assignment. Defined changes addressed additional soffit work, equipment handling and cage assembly within documented scope boundaries.
Results
- Installed mechanical equipment
- Painted line-set enclosure
- Connected construction and moves
Project scale and spatial context
CONNECT THE SYSTEMS. RESPECT THE EXISTING SPACE.
The work connected a garage-mounted condenser with routed services and interior enclosure work. The work was coordinated around existing windows, columns, workstations and finishes.

Upper enclosure | Completed
Building and workplace interfaces
The mechanical package required condenser mounting, service routing, floor coring and electrical integration. Interior framing, drywall and paint formed the workplace line-set enclosure.
Work around retained conditions
Construction protection and temporary movement of contents supported access to the work areas. The installed enclosure fits within the existing window, column and workstation setting rather than replacing the whole interior.
The ASI delivery model
ALIGN THE TRADE PACKAGES. CONNECT THE FIELD HANDOFFS.
Mechanical work, electrical integration, interior finishes and workplace contents affected one another. ASI coordinated these packages through defined scopes and changes.
Prepare the work areas
Coordinate protection and temporary movement of workplace contents so construction could reach the required areas.
Connect equipment and services
Coordinate condenser installation, routed services, coring and electrical interfaces with the mechanical package.
Coordinate the shutdown interface
Connect the specialist HVAC shutdown-relay scope with the mechanical installation, keeping system-provider responsibilities defined.
Build the interior enclosure
Coordinate metal-stud framing, drywall, line-set cover and paint around the routed services and retained interior.
Connect the workplace packages
Bring contents reset, equipment handling and cage assembly into the same field assignment through defined changes.
The outcome
INSTALLED WORK IN CONTEXT. CONNECTED RESPONSIBILITIES.
The field record shows garage-mounted mechanical equipment, a painted interior line-set enclosure and assembled equipment cages. Each sits within the retained workplace and building conditions.
A finished enclosure
The painted line-set cover integrates with the existing windows, column and surrounding workstation area.
Building-system coordination
Condenser mounting, electrical interfaces, coring and routing formed a connected installation package.
Construction-support moves
Workplace contents were moved out and returned as part of the construction-enabling assignment.
Additional equipment handling
Cage assembly and related handling were brought into a defined change package rather than treated as an unrelated job.
Field execution
FROM PROTECTED WORK AREAS TO INSTALLED FIELD PACKAGES.
The selected views show enclosure work in progress, the painted enclosure, garage-mounted mechanical equipment and cage assembly. Existing building conditions remain visible around the installed scopes.

Read the full case study.
ASI coordinated the installation and finish packages alongside protection, movement of contents and equipment handling within one workplace construction assignment.

One accountable partner.
PLANNING A WORKPLACE CONSTRUCTION PROJECT?
ASI linked the mechanical and electrical work with interior enclosure construction, protection and supporting moves. Defined change packages kept added work connected to the original assignment.