All Solutions, Inc. (ASI) helps companies execute workplace projects without having to manage disconnected vendors, trades, and field teams on their own.

Follow Us

Stantec Denver Metro Consolidation

Home > Projects > Stantec Denver Metro Consolidation
Broomfield workplace room | Before

CASE STUDY | MULTI-SITE CONSOLIDATION

CONNECT THE ORIGINS. ALIGN THE DESTINATION. ONE ACCOUNTABLE TEAM.

ASI connected four origin offices with downtown destination furniture work, coordinating dismantling, multi-trade decommissioning and targeted restoration across the Denver metro area.

View Full Case Study PDF

Stantec Denver Metro Consolidation case study cover

4 ORIGINSCONNECTED OFFICES
REBUILDDOWNTOWN DESTINATION
ONE TEAMFIELD COORDINATION

Overview

The consolidation linked Broomfield, Broadway, Colorado Boulevard and 18th Street origins with the downtown destination. ASI coordinated furniture reuse and construction interfaces through location-specific field packages.

Challenge

Consolidating offices meant more than moving contents. Furniture reuse, electrical and technology removals, wall repair and supplemental cooling varied by origin, while destination work depended on several responsible teams.

ASI approach

ASI worked with Atlantic Relocation Systems to connect the origin and destination packages. Furniture teardown and rebuild sat alongside site-specific decommissioning and restoration, with the destination trade responsibilities kept defined.

Results

  • Furniture teardown and destination rebuild
  • Targeted wall and roof restoration
  • Connected origin and destination scopes

Destination furniture planning

LINK THE WORKPLACE FOOTPRINTS. PLAN THE FURNITURE TRANSITION.

The proposed destination test fit shows workstation relationships. Origin and preparation views connect furniture teardown and rebuild with the technical interfaces at each site.

Destination workstation test fit

Destination workstation test fit

4 ORIGINSONE CONSOLIDATION
FURNITURETEARDOWN AND REBUILD
INTERFACESSITE-SPECIFIC SCOPES

The ASI delivery model

ALIGN THE LOCATION PACKAGES. CONNECT THE FIELD HANDOFFS.

Each origin had a different combination of contents, services and restoration. ASI connected these scopes with destination furniture work and the assigned construction, technology and access teams.

ORIGINS

Define the site packages

Connect four origin-office workstreams, keeping floor packages and site-specific requirements distinct.

REUSE

Dismantle and rebuild

Coordinate Broomfield workstation teardown and downtown rebuild with Atlantic's transport responsibilities.

SERVICE

Coordinate service removals

Bring electrical, low-voltage and supplemental-cooling removal interfaces into the origin decommissioning packages.

RESTORE

Address affected conditions

Connect wall scar patching, bounded roof-opening repair and related restoration with the removed workplace systems.

TEAMS

Keep team boundaries clear

Coordinate furniture with the destination construction and client technology teams, rather than treating all tenant improvements as ASI work.

The outcome

ORIGIN SCOPES CONNECTED. DESTINATION WORK COORDINATED.

The executed field packages included furniture teardown and rebuild, wall scar patching, supplemental-cooling removal and bounded roof repairs. Installed destination lettering adds a distinct finished exterior element.

Furniture reuse

Workstation dismantling at Broomfield was connected to rebuild at the downtown destination.

Targeted wall restoration

Completed scar patching is documented at Broomfield and Colorado Boulevard.

Mechanical and roof interfaces

Supplemental-cooling removal and closure of affected roof openings were coordinated as bounded field packages.

Defined destination roles

Furniture and signage work sat alongside separately assigned tenant-improvement, technology and access responsibilities.

Field execution

MULTIPLE SPACES. CONNECTED WORK STAGES.

The selected views show the original Broomfield workplace and collaboration space, downtown destination preparation and installed destination signage. Each photograph depicts its own site and phase.

Stantec Denver Metro Consolidation case study cover

Read the full case study.

ASI connected furniture work, multi-trade origin decommissioning and targeted restoration within one Denver metro consolidation assignment. Separate location scopes and responsible teams remained defined throughout the coordination.

Download PDF

Explore Stantec’s national workplace program

One accountable partner.

PLANNING A MULTI-SITE WORKPLACE TRANSITION?

ASI connected workstation teardown and rebuild with the origin restoration packages. Defined responsibilities separated furniture labor, transport and destination trade work, keeping the interfaces visible across locations.

Start a Project

Ready to Move Your Project From Plan to Field?