All Solutions, Inc. (ASI) helps companies execute workplace projects without having to manage disconnected vendors, trades, and field teams on their own.

Follow Us

Projects

Home > Projects
The Work Speaks for Itself.

The scope changes. The standard does not.

ASI completes 2,500+ projects annually, from critical single-site work to National and Multi-Site programs. The work below shows how one accountable partner connects construction, electrical, low voltage, furniture, relocation, decommissioning, logistics, documentation, and closeout to protect the schedule, control risk, and carry responsibility through completion.

Stantec Boulder supplemental cooling installation | Completed
Workplace Construction & Building-Systems Coordination

Stantec Boulder

Boulder, CO

Realogy Westlake Village office clearance | Completed
Office Exit, Relocation & Restoration

Realogy Westlake Village

Westlake Village, CA

Medidata Cincinnati retained workplace and cleared surfaces | Completed
Selective Cleanout & Office Transition

Medidata Cincinnati to Mason

Cincinnati & Mason, OH

Stantec Salt Lake City workplace boundary | In Progress
Tenant Improvement & Workplace Reconfiguration

Stantec Salt Lake City

Cottonwood Heights, UT

CDTFA Rancho Cucamonga training-room clearance | Completed
Coordinated Workplace Decommissioning

CDTFA Rancho Cucamonga

Rancho Cucamonga, CA

Low-profile under-carpet power and data pathway routed to modular workstations
Under-Carpet Power & Data Coordination

U.S. Bank Dubuque

Dubuque, IA

Brown and Caldwell San Diego cleared office interior
Paired Office Moves, Technology Integration & Closeout

Brown & Caldwell San Diego + Phoenix

San Diego, CA + Phoenix, AZ

Delta LAX opened shower wall exposing concealed pipework
Concealed Leak Investigation, Controlled Demolition & Plumbing Repair

Delta LAX

Los Angeles, CA

Apple Perimeter back-of-house wall finishes
Accelerated Back-of-House Refresh

Apple Perimeter

Atlanta, GA

HCLTech Cary cooling equipment | Before
Technical Infrastructure Decommissioning

HCLTech Cary

Cary, NC

Dassault Systèmes Paso Robles meeting-room technology environment
Relocation, Electrical, Low Voltage & Workplace Technology

Dassault Systèmes Paso Robles

Paso Robles, CA

U.S. Bank Camino Del Rio workstations and technology reset | Completed
Two-Site Consolidation, Construction and Technology Reset

U.S. Bank San Diego

San Diego, CA

Stantec Santa Barbara workplace installation in progress
Office Reconstruction, Systems Integration & Workplace Delivery

Stantec Santa Barbara

Santa Barbara, CA

Protected entry route at Stantec Irvine | In Progress
TWO-FLOOR WORKPLACE INFILL

Stantec Irvine

Irvine, California

NGFCU Palmdale kiosk power and data pathway installation
Branch Renovation & Kiosk Integration

NGFCU Palmdale Branch

Palmdale, CA

Completed long elevation and renewed color transitions | Completed
Exterior Painting & Coating Renewal

NGFCU Palmdale Exterior

Palmdale, CA

Completed Stantec Broomfield workplace with glazing and built-in work surfaces
Tenant Improvement & Complete Workplace Delivery

Stantec Broomfield

Broomfield, CO

Dassault Systèmes Michigan multi-site transition
Multi-Site Workplace, Technology & Decommissioning Transition

Dassault Systèmes Michigan

Auburn Hills, Dearborn & Royal Oak, MI

Alera Group and Barkley Oxnard technology integration
Network, Access, AV & Workplace Integration

Alera Group / Barkley

Oxnard, CA

Thomson Reuters Los Angeles project setting with equipment enclosure and building systems
Construction, Workplace Transitions, Technical Closeout & Facilities

Thomson Reuters

United States & Canada

Panasonic project trucks and removal bins
Accelerated Facility Decommissioning & Restoration

Panasonic

California

First American Title Las Vegas workplace with workstation rows and enclosed offices
National Workplace Planning, Integrated Trades & Transitions

First American Title

More than 50 service locations in 14 states

NGFCU Gardena branch construction work
Full Branch Transformation & Workplace Reset

NGFCU Gardena Branch

Gardena, CA

Workstation installation during a confidential office relocation
Cross-Country Relocation, Reuse & Decommissioning

Enterprise Office Relocation

California to Chicago, IL

Deloitte Glendale open office before coordinated decommissioning
Office Decommissioning, Warehouse Dismantling & Material Recovery

Deloitte Glendale

Glendale, CA

Completed Stantec Madison workplace
Office Buildout & Specialized Technical Spaces

Stantec Madison

Madison, WI

Custom furniture in the K-Swiss Glendale product showroom
Site Restoration, Technology & Workplace Activation

K-Swiss

Los Angeles & Glendale, CA

Vans Costa Mesa headquarters perimeter workstation desks, storage and aisle, Before.
Headquarters Reconfiguration, Furniture & Electrical

Vans Costa Mesa

Costa Mesa, CA

BAL San Francisco workplace transformation
Interior Renewal, Electrical & Workplace Transformation

BAL San Francisco

San Francisco, CA

Completed Siemens Albany corridor with renewed walls, carpet and accent finish
Workplace Renewal, Finishes, Power & Data

Siemens Albany

Albany area, New York

Brown and Caldwell Vancouver meeting space with furniture and audiovisual technology
Cross-Border Procurement, Technology & Workplace Transition

Brown & Caldwell Vancouver

Burnaby & Vancouver, BC, Canada

KPMG Seal Beach office decommission
Office Decommissioning, Asset Reuse & Electrical Safe-Off

KPMG Seal Beach

Seal Beach, CA

Tenant electrical removal during the Dassault Systèmes Woodland Hills decommissioning
Large-Scale Decommissioning, Restoration & Lease Handback

Dassault Systèmes

Woodland Hills, CA

Dassault Systèmes Pleasanton workplace renovation and technology preparation | In Progress
Renovation, Technology Integration & Workplace Transition

Dassault Systèmes Pleasanton

Pleasanton, CA

Toronto workplace decommissioning
Furniture, Technical Systems & Two-Floor Workplace Transition

Thomson Reuters Toronto

Toronto, ON

Arrow Electronics consolidated workstations
National Portfolio Consolidation & Facility Closeout

Arrow Electronics

Nationwide

Vans Cypress headquarters decommission
Headquarters Decommissioning, Electrical Safe-Off & Loadout

Vans Cypress

Cypress, CA

Built production-set structure at the AwesomenessTV and Viacom Canoga Park studio
Accelerated Studio Decommissioning, Restoration & Lease Handback

AwesomenessTV & Viacom

Canoga Park, CA

Stantec Hauppauge workstation reconfiguration | Completed
Planning, Construction, Furniture & Portfolio Support

Stantec National Program

United States & Canada

Completed Stantec Austin plot room
Workplace Renovation & Building Systems Integration

Stantec Austin

Austin, TX

CIM Group workplace reconfiguration
Occupied-Office Transformation & Integrated Trades

CIM Group

Los Angeles, CA

Brown and Caldwell network infrastructure
Multi-Site Technology Rollout & Program Management

Brown & Caldwell

25 U.S. states, Guam & British Columbia

Wide view of Presbia workstations and offices
Workplace Strategy, Redesign & Relocation

Presbia

California

Caltrans Santa Fe Springs workstation bank | Completed
Workplace Recovery, Furniture Reuse & Installation

Caltrans Santa Fe Springs

Santa Fe Springs, CA

Pleasant Hill workplace decommission | Completed
Office Decommissioning & Landlord Turnover

Dassault Systèmes Pleasant Hill

Pleasant Hill, CA

Brown and Caldwell Maitland workplace decommission case study
Office Decommissioning & Landlord Turnover

Brown and Caldwell Maitland

Maitland, FL

Reconfigured Stantec Chandler workplace with coordinated wall, ceiling and mechanical elements
Tenant Improvements & Building-Systems Coordination

Stantec Chandler

Chandler, AZ

Completed CIM Group Longwood open work area
Workplace Furniture, Installation & Site Follow-Through

CIM Group Longwood

Longwood, FL

Brown and Caldwell Blue Ash workplace transition
Integrated Workplace Transition, Furniture & Technology

Brown and Caldwell Blue Ash

Blue Ash, OH

Completed Stantec St. George kitchenette
Kitchenette Renovation, Millwork & Building Systems

Stantec St. George

St. George, UT

Reused workstation layout at Stantec Hauppauge
Workplace Reconfiguration & Furniture Reuse

Stantec Hauppauge

Hauppauge, NY

Cleared Stantec Chicago workplace with retained finishes
Office Decommissioning & Restoration Coordination

Stantec Chicago

Chicago, IL

Cleared open workplace at HCLTech Westlake Village
Workplace Decommissioning & Giveback

HCLTech Westlake Village

Westlake Village, CA

Cleared Northampton office with brick walls and timber floors
Workplace Reconfiguration, Furniture & Electrical

Stantec Northampton

Northampton, MA

Cleared Wilshire Santa Monica workplace after assigned office exit work
Phased Office Decommissioning

Wilshire Santa Monica

Santa Monica, CA

Cleared office floor at Hanley Wood, 6222 Wilshire Boulevard, Suite 600, Los Angeles. | Completed
Office Decommission & Technical Removals

Hanley Wood Los Angeles

Los Angeles, CA

Cleared Stantec workplace in Denver
Workplace Decommissioning & Technical Coordination

Stantec Denver

Denver, CO

Stantec Wasilla reception-area closeout | Completed
Coordinated Office Closeout

Stantec Wasilla

Wasilla, AK

Stantec Sacramento open-office removal | Completed
Interior Decommissioning & Wall Repairs

Stantec Sacramento

Sacramento, CA

Stantec Cincinnati Canal Road warehouse cleanout | Completed
Office, Warehouse & Tenant-Sign Closeout

Stantec Cincinnati

Cincinnati, OH

CIM Group Dallas retained workplace and wall patching | Completed
Selective Tenant-Identity & Wall Closeout

CIM Group Dallas

Dallas, TX

Thomson Reuters Bellevue open-work-area clearance | Completed
Two-Floor Office & Technical Closeout

Thomson Reuters Bellevue

Bellevue, WA

Thomson Reuters Carrollton case-study cover
Workplace Carpet Replacement

Thomson Reuters Carrollton

Carrollton, TX

Brown and Caldwell national program, Maitland workplace removal | Completed
National Workplace Delivery

Brown and Caldwell

United States

Stantec Portland office clearance | Completed
Office Clearance & Redistribution

Stantec Portland

Portland, OR

Bakersfield office privacy glazing, Completed
Workplace Reconfiguration

Stantec Bakersfield

Bakersfield, CA

Line-set enclosure | Completed
Workplace Construction

Thomson Reuters Alameda

Los Angeles, CA

Destination signage | Completed
Multi-Site Consolidation and Restoration

Stantec Denver Metro

Denver metro, CO

Open-office furniture clearance
Multi-Floor Office Decommissioning

Clarivate Boston

Boston, MA

Open-office clearance | In Progress
Complete-Suite Workplace Decommissioning

Clarivate Minneapolis

Minneapolis, MN

Workplace clearance | In Progress
Office Decommissioning & Wall Preparation

Stantec Pasadena Los Robles

Pasadena, CA

Open-office installation | In Progress
Workplace Installation & Power Interfaces

CIM Group Atlanta

Atlanta, GA

Installed cherry and black office desk with matching storage hutch | Completed
Phased Furniture Installation

Star Stainless Commerce

Commerce, CA

Bench workstations in CIM Group's original Phoenix workplace | Completed
Workplace Furniture, Expansion & Field Follow-Through

CIM Group Phoenix

Phoenix, AZ

Photography: Leland Gebhardt Photography
Open-office clearance | In Progress
Office Decommissioning

Stantec Boston Causeway

Boston, MA

Crew working from a suspended platform at the upper building facade during sign removal. | In Progress
Selective Closeout & Elevated Sign Removal

Stantec Tucson

Tucson, AZ

Retained workstation area | In Progress
Selective Workplace Clearance

Thomson Reuters Los Angeles

Los Angeles, CA

Later furniture placement | Completed
Phased Workplace Execution

Randstad San Francisco

San Francisco, CA

Display installation | In Progress
Workplace Transition

Thomson Reuters McLean

McLean, VA

Two workplace phone booths during the separately sequenced installation stage.
Construction

Cisco San Francisco Phased Anchoring

San Francisco, California

Cleared Culver City open-floor furniture area with retained columns and floor services.
Office Clearance

Syska Hennessy: Coordinated Origin-Office Clearance

Culver City, California

Completed black meeting-room wall repaint in Vancouver, with existing framed artwork retained.
Workplace Finishes

Microsoft Vancouver: Meeting-Room Wall Repaint

Vancouver, British Columbia

Cleared Stockton office footprint with glass-fronted rooms, columns and existing carpet.
Office clearance and sign removal

Dohrmann Insurance | Stockton Office Clearance and Sign Removal

Stockton, California

El Segundo conference room with visible wall-preparation patches, retained pendant lighting and an existing floor core.
Workplace restoration

Pacific Retail: Office-Turnover Wall Preparation

El Segundo, California

Assembled workstation panels and glass extensions alongside office circulation.
Workplace furniture and finishes

Orion Risk Management Irvine: Workstation Renewal and Privacy Finishes

Irvine, California

Assembled panel workstations with worksurfaces and storage | Completed
Workstation Reconfiguration and Cleaning

Sunrise Management San Diego

San Diego, CA

Office circulation area with protected wall edges and a painter working at the far end.
Workplace construction and decommissioning

Cognizant San Francisco: Coordinated Construction and Suite Decommissioning

San Francisco, California

Boarded glass-door opening at the Green Bay facility, with existing masonry and snow retained.
Facility winterization

Orkin | Green Bay Facility Winterization

Green Bay, Wisconsin

Cleared open-office field with retained walls, carpet and visible selective restoration conditions.
Interior decommissioning and construction-stage restoration

Thomson Reuters: Lake Oswego Interior Decommissioning

Lake Oswego, Oregon

Private-office furniture and existing carpet before clearance.
Workplace decommissioning

Cushman & Wakefield: Coordinated Diamond Bar Office Clearance

Diamond Bar, California

Boston workplace decommissioning within Clarivate's national program
National Workplace Transitions & Decommissioning

Clarivate National

Multiple U.S. locations

Conference furniture and technology integration | In Progress
Furniture, Moving & Technology Integration

Brown and Caldwell Portland

Portland, Oregon

Reception furniture clearance | Completed
Workplace Clearance & Asset Redistribution

Clarivate Rockville

Rockville, Maryland

Las Vegas furniture and workplace integration | In Progress
Furniture, Power & Workplace Integration

First American Title Las Vegas

Las Vegas, Nevada

Bend cleared work area and furniture movement | In Progress
Phased Furniture Moves & Workplace Reset

First American Title Bend

Bend, Oregon

First American Title Tomball office contents removal | Completed
Office Decommissioning & Contents Removal

First American Title Tomball

Tomball, Texas

Main workplace footprint clearance | Completed
Final-Phase Workplace Clearance

Clarivate Parsippany

Parsippany, New Jersey

Little Canada workstation removal footprint | In Progress
Technical Office Decommissioning

First American Title Little Canada

Little Canada, Minnesota

First American Title Cleveland workstation panel reconfiguration | In Progress
Workplace Panel Adaptation

First American Title Cleveland

Cleveland, Ohio

First American Sun Valley cabinet handling and dispatch | In Progress
Records & Workplace Transition

First American Sun Valley to Burbank

Sun Valley to Burbank, California

First American Escondido protected contents movement | In Progress
Office Contents Relocation

First American Title Escondido

Escondido, California

First American Title Albany private-office furniture return | Completed
Furniture Clearance & Return

First American Title Albany

Albany, Oregon

First American Title Gresham cleared workplace area | In Progress
Phased Workplace Transition

First American Title Gresham

Gresham, Oregon

First American Title Philadelphia main office furniture clearance | Completed
Office Clearance

First American Title Philadelphia

Philadelphia, Pennsylvania

First American Title Ridgecrest office contents delivery | Completed
Office Contents Relocation

First American Title Ridgecrest

Ridgecrest, California

First American Title Everett power and retained workplace interfaces | In Progress
Workstation & Electrical Access

First American Title Everett

Everett, Washington

Rack and patch-panel work | Completed
Workplace technology

Alera Group Fresno Cellular Connectivity and Cabling

Fresno, California

Reused open-workplace furniture | Completed
Phased workplace transition

Stantec Mechanicsburg Phased Workplace Transition

Mechanicsburg, Pennsylvania

Meeting room | Completed
Construction and workplace infrastructure

Stantec Los Angeles Integrated Workplace Construction

Los Angeles, California

Open-workplace clearance | Completed
Municipal office decommission

City of Long Beach Municipal Office Decommission

Long Beach, California

Office clearance | Completed
Multi-trade office decommission

Stantec Bellevue Multi-Trade Office Decommission

Bellevue, Washington

Room-based technology packing | Completed
Teams room AV decommission

Performance Food Group Naperville

Naperville, Illinois

Office clearance | Completed
Coordinated office exit

Siemens Huntington Beach

Huntington Beach, California

Office workstations during the defined technical disconnection phase | In Progress
Power and Data Disconnection

Siemens Buffalo Grove

Buffalo Grove, IL

KPMG San Antonio office condition after the technical and finishing assignment | Completed
Technical Decommission and Wall Restoration

KPMG San Antonio

San Antonio, TX

Cleared open-office area at Stantec's Bellevue 33rd Place workplace. Completed.
Decommissioning and Office Exits

Stantec Bellevue 33rd Place

Bellevue, Washington

Office area cleared of furniture with existing flooring and ceiling systems retained. Completed.
Decommissioning and Workplace Exit

Stantec Washington, DC

Washington, DC

The windowed office area with renewed carpet, base and painted walls. Completed.
Construction and Renovation

Stantec Ventura

Ventura, California

Open office cleared of designated furniture with actual carpet wear and coiled wall cables remaining. Completed clearance.
Decommissioning and Office Clearances

Stantec Alpharetta

Alpharetta, Georgia

Open work area | Completed
Decommission and workplace exit

Stantec Van Nuys

Van Nuys, California

Office wall repaint | Completed
Construction and Interior Finishes

Realogy Glendale Interior Repaint

Glendale, California

Exterior signage removal | Completed
Construction and Facility Closeout

Cameron Benicia Industrial Exit

Benicia, California

Open-office clearance | Completed
Workplace Decommissioning

Stantec Ann Arbor Workplace Exit

Ann Arbor, Michigan

Exterior sign removal | Completed
Construction and Technical Decommissioning

Stantec Louisville Laboratory Decommissioning

Louisville, Kentucky

Office contents clearance | Completed
Workplace Decommissioning

Stantec Lynnwood Multi-Level Workplace Exit

Lynnwood, Washington

Completed central concrete infill and control joints in the Karma Automotive test-area room.
Construction and Industrial Workplace Exit

Karma Automotive

Costa Mesa, California

Office contents clearance | Completed: cleared San Jose workspace with retained windows, ceiling and floor finishes.
Decommissioning

Stantec San Jose

San Jose, California

Cleared warehouse floor area and repaired wall surfaces at Geotech Supply in Anaheim.
Decommission and Restoration

Geotech Supply Anaheim Workplace Exit Restoration

Anaheim, California

Oriental Motor warehouse floor clearance in Torrance, Completed
Decommissioning and Facility Clearance

Oriental Motor Torrance Industrial Facility Clearance

Torrance, California

Cleared open office area at TEi in Santa Fe Springs
Decommissioning

TEi Santa Fe Springs

Santa Fe Springs, California

Pearson Washington, DC painting and flooring interfaces, In Progress
Construction and Interior Renovation

Pearson Washington, DC Carpet and Paint Refresh

Washington, DC

Reused cubicle panels, shelves, worksurfaces and pedestal storage in the Inglewood office | Completed
Phased Workplace Reuse

Walsh/Shea Inglewood

Inglewood, CA

Electrical and data connections during the U.S. Bank Encino workplace dismantling | In Progress
Technical Workplace Decommission

U.S. Bank Encino

Encino, CA

Cleared circulation and affected office area in CompWest's Santa Ana suite | Completed
Relocation and Decommissioning

CompWest Santa Ana

Santa Ana, CA

Relocated containers and the reassembled canopy and fenced enclosure at the campus receiving location | Completed
Construction and Site Work

El Camino College

Torrance, CA

Cleared workstation area at Regent Properties in Los Angeles | Completed
Office Decommissioning & Technical Removal

Regent Properties Los Angeles

Los Angeles, CA

Removed workplace cable collected for handling during the Zenith office exit | In Progress
Technical Office Decommission

Zenith Los Angeles

Los Angeles, CA

Reused blue-and-white BlueGrace workstations assembled in the receiving Phoenix office | In Progress
Workplace Reuse

BlueGrace Burbank to Phoenix

Burbank, CA to Phoenix, AZ

Cleared open work area at Cylance 18500 Von Karman, with existing floors and building finishes retained | Completed
Two-Building Workplace Decommission

Cylance Irvine

Irvine, CA

Installed acoustic office wall panels at McGriff Birmingham | Completed
Acoustic Finishes and Display Power

McGriff Birmingham

Birmingham, AL

Cleared furniture footprint within Stantec Redlands, retaining existing room divisions, built-in features and visible selected wall patches | Completed
Office Clearance and Selected Restoration

Stantec Redlands

Redlands, CA

Rebuilt workstation groups in Kearney, Nebraska | Completed
Interstate Workplace Reuse

UST Global / Xpanxion

Kearney, NE

Open workplace following selected furniture removal at Deckers in Goleta | Completed
Selective Workplace Decommission

Deckers Brands, Goleta

Goleta, CA

Removed low-voltage cabling from the Sovos Calabasas technical assignment | Completed
Technical Workplace Decommission

Sovos, Calabasas

Calabasas, CA

Reassembled Cemex workstation groups in Ontario, with the existing ceiling opening and hanging cable retained | Completed
Phased Workstation Reuse

Cemex, Ontario

Ontario, CA

ASI crew repositioning a work surface during Starcom workstation installation, with bare frames and necessary assembly parts visible | In Progress
Workstation and Power Reconfiguration

Starcom, North Hollywood

North Hollywood, CA

Dismantled frames staged | Completed
Decommission

CashCall

Orange, CA

Cleared source office | Completed
Decommission

Bezaire, Ledwitz & Associates

Torrance, CA

Cleared Affinity Irvine workplace | Completed
Decommission

Affinity Investment Advisors

Irvine, CA

Open workspace after furniture clearance | Completed
Decommission

CCC Information Services

Cerritos, CA

Rows of rebuilt Monterey Park workstations during installation | In Progress
Workplace Reconfiguration

Los Angeles Dependency Lawyers

Monterey Park, CA

Finished workstation interior | Completed
Furniture & Workplace Installation

EmployBridge

Oxnard, CA

Open workstation area after removal | Completed
Relocation and Decommission

Stantec

San Diego, CA

Little Canada warehouse | Before
Relocation and Decommission

Stantec

Twin Cities, MN

Wall finish | Completed
Construction

Microsoft

San Francisco, CA

Monitor protection | Completed
Technology

Ascensus

Newton, MA

Workstation power disconnection | Completed
Electrical

Hilldrup

Denver, CO

Workstation area | Before
Decommissioning

KPMG

Woodland Hills, CA

Ready to Move Your Project From Plan to Field?